Draft Survey

A draft survey is a maritime procedure based on Archimedes’ principle, determining the weight of cargo loaded or unloaded by measuring a vessel’s displacement change.

Surveyors calculate weight by reading draft marks at six points (forward, midship, aft on both sides), accounting for ballast/bunkers, water density, and trim corrections.

Why are Draft Surveys Important?

  • Ensure accurate cargo quantity measurement
  • Help prevent disputes between shipowners, charterers, and cargo interests
  • Support compliance with contracts (e.g., charter parties, sale agreements)
  • Provide a practical solution when shore scales are unavailable (common with bulk cargo)

What Does a Draft Survey Involve?

1. Draft Readings

  • Measuring draft at:
  • Forward (F)
  • Midship (M)
  • Aft (A)
  • On both port and starboard sides

2. Initial & Final Surveys

  • Initial survey → before loading/discharging
  • Final survey → after completion

3. Displacement Calculation

  • Using hydrostatic tables to convert draft into displacement

4. Corrections Applied

  • Ballast water
  • Fuel (bunkers)
  • Freshwater
  • Stores and consumables

5. Environmental Adjustments

  • Water density (dock water vs seawater)
  • Trim and list corrections
  • External conditions (waves, swell)